Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Amirtash, P, Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for International Engineering, Procurement and Construction projects. Built Environment Project and Asset Management, 11(2), 330-49.

  • Type: Journal Article
  • Keywords: engineering, procurement and construction project; corporate culture; collaboration; procurement; contractors; project engineering; management services; skills
  • ISBN/ISSN:
  • URL: http://dx.doi.org/10.1108/BEPAM-06-2020-0106
  • Abstract:
    International Engineering, Procurement and Construction (IEPC) projects deliver complex and critical infrastructure and construction projects. However, these projects face multiple challenges, especially in foreign construction markets, to the main contractors. The purpose of this article is to develop a tool for effective implementation of project management services for these international projects through upskilling and incorporate local expertise. Accordingly, the employment of a Native Project Management Consultant (NPMC) by the main contractor is proposed and investigated. A three-stage research method was employed for triangulation of knowledge. Initially, a comprehensive literature review was carried out to examine the theoretical foundations of the study. The concepts were further explored through a survey and expert interviews. The study was performed in Iran as the host nation of multiple IEPC projects. It was found that NPMC involvement has a significant contribution to the success of nearly all project management areas in IEPC projects. However, quality, schedule and budget management were the top-ranked areas. The study combines the results of previous studies with the interviews and questionnaire to create a tool designed to capture strategy actions and detailed activities designed to build capabilities in IEPC teams through the involvement of NPMCs. A practical tool is developed which aims to enhance NPMC integration into IEPC projects. The tool is in-line with the project management concept of work-breakdown structure; which is understandable by project stakeholders.Originality/valueThe employment of NPMCs, and their potential role in IEPC projects has not been formally investigated and guidelines for such collaborations do not exist. The current study provides a platform for regulating such facilitators and enhancing project success.

Bhattacharya, S, Momaya, K S and Iyer, K C (2021) Bridging the gaps for business growth among Indian construction companies. Built Environment Project and Asset Management, 11(2), 231-50.

Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), 369-91.

Isuri Anuradha, A, Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), 304-29.

Moyo, T, Crafford, G and Emuze, F (2021) People-centred management for improving construction workers' productivity in Zimbabwe. Built Environment Project and Asset Management, 11(2), 350-68.

Ottou, J A, Baiden, B K, Nani, G and Martin Morgan, T (2021) Benefits of implementing Six Sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), 214-30.

Safapour, E, Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), 157-73.

Sekar, G, Sambasivan, M and Viswanathan, K (2021) Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), 174-94.

Sun, J, Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), 284-303.

Tuffaha, F M, Assaf, S, Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), 195-213.

Verma, S, Mandal, S N, Robinson, S, Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: a developing economy case study. Built Environment Project and Asset Management, 11(2), 392-408.

Zarghami, S A and Gunawan, I (2021) The emergence and evolution of reliability theory for water distribution networks. Built Environment Project and Asset Management, 11(2), 251-65.